Projects
Geo-Innovate for a Sustainable Nation Addressing Crucial Ecosystem Challenges
Principle Investigator : Dr. P. Shoba
Project Cost : ₹ 3 Lakhs
Duration : 14-MAY-24 to 13-MAY-25
Funding : NGP, DST, INDIA
LANDSLIDE INVENTORY MAPPING FOR POST MONSOON 2023 FOR TAMIL NADU
Principle Investigator : Dr. P. Shoba
Project Cost : ₹ 5.42 Lakhs
Duration : 27-FEB-24 to 26-FEB-25
Funding : NRSC, ISRO
Mathematical Modelling Studies for finding out location of intake outfall for a desalination plant at MIRFA, Abu Dhabi, UAE
Principle Investigator : R. Manivanan
Project Cost : ₹ 5 Lakhs
Duration : 01-MAY-23 to 30-JUN-23
Funding : GE3S and Dome international consulting, Abu Dhabi
Integrated watershed-reservoir water quality modelling under climate change scenarios for developing mitigation measures to sustain the life of the reservoir
Principle Investigator : Dr. E. Arun Babu
Project Cost : ₹ 2630360 Lakhs
Duration : 10-FEB-23 to 09-FEB-26
Funding : SERB DST
CO2 Utilization
Principle Investigator : Dr. K. Palanivelu
Duration : 23-AUG-21 to 30-JUN-23
Mathematical Modelling Studies for littoral drift and shoreline changes for Infrastructure Development at Nyhaya Shava, MDL, Mumbai
Principle Investigator : R. Manivanan
Project Cost : ₹ 7 Lakhs
Duration : 01-JAN-21 to 31-MAY-23
Funding : Indian Navy, Government of India
�INDOGERMAN PARTNERSHIP IN CLIMATE AND WATER RESEARCH (IGCaWR) - Influence of regional climate change on the groundwater resilience in selected urba
Principle Investigator : Dr. K. Palanivelu
Duration : 15-JUL-20 to 14-JUL-24
: Mathematical Modelling Studies to examine effluent dispersion for the proposed port at Thane Creek, Mumbai for MMB, Mumbai
Principle Investigator : R. Manivanan
Project Cost : ₹ 8 Lakhs
Duration : 02-JUN-20 to 29-JUN-21
Funding : Maharashtra Maritime Board, Mumbai
Influence of Temperature and Duration of Calcination on the Valorisation of Calcined Sugarcane Press Mud in Lime Stabilization of an Expansive Soil
Principle Investigator : Dr. Jijo James
Project Cost : ₹ 2.5 Lakhs
Duration : 01-DEC-19 to 30-NOV-21
Funding : SSN Trust, Chennai
Critical Analysis of Pattern of Development for a Smart City Using Innovative Approach
Principle Investigator : Dr. G. Umadevi
Duration : 01-JUL-19 to 31-DEC-19
Economic Sustainability of Provision of Infrastructure in Smart City Using Innovative Techniques for T-Nagar, Chennai City
Principle Investigator : Dr. G. Umadevi
Duration : 01-JUL-19 to 01-DEC-19
Tamarind Harvesting Machine
Principle Investigator : Dr. V. Ramji
Duration : 01-JUL-19 to 31-JAN-20
A Novel approach to model Soil Desertification Risk in Vellore district using Multispectral and Microwave Remote Sensing Techniques
Principle Investigator : Dr. P. Shoba
Project Cost : ₹ 2116000 Lakhs
Duration : 14-MAR-19 to 13-JUL-22
Funding : DST SERB
MEMBRANE PROCESSES FOR CO2 RECOVERY AND ITS UTILIZATION
Principle Investigator : Dr. K. Palanivelu
Duration : 03-DEC-18 to 02-DEC-21
Dynamic Simulation (DS) Modelling of Road Network Design based on geography and Geo-morphological Aspects of Evolving Sustainable Smart City
Principle Investigator : Dr. G. Umadevi
Project Cost : ₹ 25000 Lakhs
Duration : 23-JUL-18 to 18-DEC-18
Funding : CTDT
Micro Level Dynamic Simulation (DS) Modelling of Traffic Impact Assessment for Chennai
Principle Investigator : Dr. G. Umadevi
Project Cost : ₹ 25000 Lakhs
Duration : 17-JUL-18 to 28-DEC-18
Funding : CTDT
Mathematical Modelling Studies for relocation of sand trap at Chennai Port
Principle Investigator : R. Manivanan
Project Cost : ₹ 17 Lakhs
Duration : 02-APR-18 to 24-JUN-19
Funding : Chennai Port Trust
Study on the impact of extreme Climate Changes affecting communities live in coastal Panchayats in Tamil Nadu
Principle Investigator : Dr. K. Palanivelu
Duration : 01-APR-18 to 31-MAR-19
Dynamic downscaling to study climate Change impacts on water Resources
Principle Investigator : Dr. K. Palanivelu
Duration : 01-APR-18 to 31-MAR-20
Establishment and strengthening of Tamil Nadu state climate Change Knowledge management cell (TNSCC-KMC)
Principle Investigator : Dr. K. Palanivelu
Duration : 02-OCT-17 to 30-SEP-22
Micro level Modeling of Land Use Transport Balancing in Chennai : A Systems Approach
Principle Investigator : Dr. G. Umadevi
Project Cost : ₹ 25000 Lakhs
Duration : 16-AUG-17 to 27-FEB-18
Funding : CTDT
Accident Prediction & Costing Modeling for Chennai : A Systems Approach
Principle Investigator : Dr. G. Umadevi
Project Cost : ₹ 25000 Lakhs
Duration : 09-AUG-17 to 26-FEB-18
Funding : CTDT
Monitoring and Evaluation of Integrated Watershed Management Programme watersheds of Tamilnadu using Geospatial Technologies
Principle Investigator : Dr. K. Srinivasa Raju
Duration : 01-JAN-17 to 31-DEC-20
Applications RS and GIS in Sericulture Development Phase 2 TN
Principle Investigator : M. Navamuniyammal
Duration : 01-NOV-16 to 30-APR-18
Constructed Wetland for Treatment of Grey Water
Principle Investigator : Dr. K. Soundaranayaki
Duration : 07-SEP-16 to 07-SEP-16
GIS Based Simulation Modeling of Sustainable Planning of Smart City In Chennai
Principle Investigator : Dr. G. Umadevi
Project Cost : ₹ 16000 Lakhs
Duration : 10-AUG-16 to 20-MAR-17
Funding : CTDT
IMPACT OF CLIMATE CHANGE ON FLUVIAL AND PLUVIAL FLOODING IN SELECTED AREAS OF CHENNAI METROPOLITAN AREA
Principle Investigator : Dr. K. Palanivelu
Duration : 01-APR-16 to 31-DEC-17
Development of the Framework for networking Programme on Village Information System (VIS) under NRDMS
Principle Investigator : Dr. K. Srinivasa Raju
Duration : 01-MAR-16 to 28-FEB-18
CO2 GAS SEPARATION FROM FUEL AND FLUE GAS USING COMPOSITE MEMBRANES
Principle Investigator : Dr. K. Palanivelu
Duration : 01-DEC-15 to 30-NOV-18
Development of Pavement Condition Index for Urban Roads
Principle Investigator : Dr. Ganapathi Malarvizhi
Duration : 23-SEP-15 to 23-DEC-20
Transport and Economy Interaction
Principle Investigator : Dr. G. Umadevi
Project Cost : ₹ 25000 Lakhs
Duration : 03-AUG-15 to 25-FEB-16
Funding : CTDT
Seismic Performance of CFT Bridge Piers
Principle Investigator : Dr. C. Umarani
Project Cost : ₹ 11 Lakhs
Duration : 01-APR-15 to 31-MAR-20
Funding : UGC
DISTRICT WISE CLIMATE CHANGE INFORMATION FOR THE STATE OF TAMIL NADU
Principle Investigator : Dr. K. Palanivelu
Duration : 02-MAR-15 to 31-AUG-15
Modalities Suggested for Implementing the Project on Water Security at the Village Level in Tiruchirappalli and Tiruppur Districts of Tamil Nadu
Principle Investigator : Dr. V. Lenin Kalyana Sundaram
Duration : 01-JAN-15 to 31-DEC-15
Integrated Planning of Transport Demand Supply for Chennai City & Peri Urban Areas using Advanced Modeling Techniques
Principle Investigator : Dr. G. Umadevi
Duration : 01-JAN-15 to 31-DEC-20
LAND USE CHANGES AND WATER CONTAMINATION GREEN HOUSE GAS MONITORING AT MUNICIPAL SOLID WASTE DUMPSITE IN CHENNAI
Principle Investigator : Dr. K. Palanivelu
Duration : 01-JAN-15 to 31-DEC-15
Modalities Suggested for Implementing the Project on Water Security at the Village Level
Principle Investigator : Dr. V. Lenin Kalyana Sundaram
Duration : 01-AUG-14 to 30-NOV-15
Simulation Modeling for Economic Evaluation of transportation projects
Principle Investigator : Dr. G. Umadevi
Project Cost : ₹ 25000 Lakhs
Duration : 17-DEC-13 to 23-MAY-14
Funding : CTDT
Transport and Energy Interaction
Principle Investigator : Dr. G. Umadevi
Project Cost : ₹ 25000 Lakhs
Duration : 12-DEC-13 to 13-MAR-14
Funding : CTDT
Road network study in Peri urban areas of Chennai
Principle Investigator : Dr. G. Umadevi
Duration : 30-NOV-13 to 01-JUN-18
Post Project Evaluation Study of Krishnagiri Reservoir project
Principle Investigator : Dr. E. Arun Babu
Duration : 21-AUG-13 to 21-APR-14
Enhancing Level of Service along Urban Arterials : A systems Approach
Principle Investigator : Dr. G. Umadevi
Project Cost : ₹ 25000 Lakhs
Duration : 04-FEB-13 to 28-JUN-13
Funding : CTDT
Development of Indian Highway Capacity manual (Indo HCM)
Principle Investigator : Dr. K. Gunasekaran
Duration : 01-JAN-13 to 31-MAR-14
To Study the Effect of Suction Head on the Performance of Floating Centrifugal Pumps in Agricultural Open Wells
Principle Investigator : Dr. V. Lenin Kalyana Sundaram
Duration : 01-APR-12 to 31-MAR-13
Performance assessment of recharge shafts on groundwater quantity and quality and its impact on agricultural productivity
Principle Investigator : Dr. V. Ramji
Duration : 01-FEB-11 to 01-FEB-12
Application of RS and GIS for sericulture Development
Principle Investigator : M. Navamuniyammal
Duration : 04-JAN-11 to 04-JAN-11
Study on Safety at Work Zones in Urban Areas
Principle Investigator : Dr. K. Gunasekaran
Duration : 03-JAN-11 to 28-JUN-13
Improving Transit System Performance through Automatic Data Collection Systems
Principle Investigator : Dr. K. Gunasekaran
Duration : 01-JAN-11 to 28-JUN-13
biomethanation of vegetable waste
Principle Investigator : B. Manimekalai
Duration : 10-JUN-10 to 15-JUN-11
Decision Support System for Safety Evaluation of Urban Intersections
Principle Investigator : Dr. K. Gunasekaran
Duration : 23-APR-10 to 25-OCT-13
Energy Efficiency Enhancement of Grid Powered Surface Mounted Pump Sets in Open Wells by a Innovative Floating Platform Arrangement
Principle Investigator : Dr. V. Lenin Kalyana Sundaram
Duration : 01-MAR-10 to 28-FEB-11
Institutional Support and Human Resource Development for Research on the Assessment, Mitigation and Management of Natural Hazards
Principle Investigator : Dr. K. Srinivasa Raju
Duration : 01-JAN-10 to 31-DEC-16
Transport Demand Supply Modeling using Simulation Modeling
Principle Investigator : Dr. G. Umadevi
Project Cost : ₹ 25000 Lakhs
Duration : 22-DEC-09 to 15-APR-14
Funding : CTDT
Treatment of sewage using UASB and MBR for biogas recovery and nutrient removal
Principle Investigator : Dr. Kurian Joseph
Duration : 27-OCT-09 to 31-DEC-12
Seasonal Variations In Water Quality And Quantification Of Pollutants Of Kodaikanal Lake
Principle Investigator : Dr. G. Dhinagaran
Duration : 01-SEP-09 to 10-DEC-10
Recovery of useful products from waste CO2 gas
Principle Investigator : Dr. K. Palanivelu
Duration : 01-SEP-09 to 31-AUG-14
Traffic Impact and Ciruculation Studeis with Simulation Modelling for Inner Ring Road, Chennai
Principle Investigator : Dr. G. Umadevi
Project Cost : ₹ 100000 Lakhs
Duration : 02-JUN-09 to 17-FEB-10
Funding : Hilton Group of Hotels
Performance Assessment of Existing Road Bridges
Principle Investigator : Dr. C. Umarani
Project Cost : ₹ 11 Lakhs
Duration : 01-APR-09 to 31-MAR-14
Funding : UGC
Slab Effects on Building Seismic Performance
Principle Investigator : Dr. C. Umarani
Project Cost : ₹ 6 Lakhs
Duration : 01-APR-09 to 31-MAR-12
Funding : AICTE
Pavement Performance Modelling for Urban Roads.
Principle Investigator : Dr. Ganapathi Malarvizhi
Duration : 12-JUN-08 to 25-AUG-11
Monitoring and database management of the waterways of Chennai city
Principle Investigator : Dr. K. Palanivelu
Duration : 01-APR-08 to 31-MAR-13
Study on Bus Priority Lane
Principle Investigator : Dr. K. Gunasekaran
Duration : 01-APR-08 to 31-DEC-13
Formulation of Road Network in Periurban Interface of Chennai Metropolitan Area (CMA)
Principle Investigator : Dr. G. Umadevi
Project Cost : ₹ 1000000 Lakhs
Duration : 15-JAN-08 to 18-DEC-13
Funding : UGC, Centre for Advanced Studies
Institutional Support and Human Resource Development for Research on the Assessment, Prevention, Mitigation and Early Warning of Tsunamis and Landslid
Principle Investigator : Dr. K. Srinivasa Raju
Duration : 01-NOV-06 to 31-DEC-10
Water Quality assessment in the Tsunami affected coastal areas of Tamilnadu – Adyar
Principle Investigator : Dr. K. Palanivelu
Duration : 01-APR-05 to 30-SEP-05
Recovery of VOCs from waste effluents by pervaporation
Principle Investigator : Dr. K. Palanivelu
Duration : 01-APR-04 to 31-MAR-06
“Sustainable Landfill Management in Asiaâ€
Principle Investigator : Dr. Kurian Joseph
Duration : 01-JAN-04 to 30-JUN-08
“ Management of Total Dissolved Solids in exhausted reactive dye bath from knitted cotton dyeing unitsâ€
Principle Investigator : Dr. Kurian Joseph
Duration : 01-JAN-04 to 31-DEC-06
Traffic operational Management for Medium Town Thirupatthur
Principle Investigator : Dr. G. Umadevi
Project Cost : ₹ 100000 Lakhs
Duration : 22-DEC-03 to 09-AUG-04
Funding : Department of Town and Country Planning, Tamil Nadu
Studies on removal and recovery of hexavalent chromium from plating wastewater using supported liquid membrane
Principle Investigator : Dr. K. Palanivelu
Duration : 01-APR-02 to 31-DEC-03
Traffic operational Management for Medium Town Pattukottai
Principle Investigator : Dr. G. Umadevi
Project Cost : ₹ 100000 Lakhs
Duration : 05-NOV-01 to 27-DEC-02
Funding : Department of Town and Country Planning, Tamil Nadu
“Rehabilitation of Municipal Solid Waste Dump sitesâ€
Principle Investigator : Dr. Kurian Joseph
Duration : 01-JUN-01 to 31-DEC-03
Urban Transportation and Land Use Planning in 2000
Principle Investigator : Dr. G. Umadevi
Duration : 14-MAR-00 to 16-AUG-01
Traffic study for Chollaimedu Intersection - A Feasibility study
Principle Investigator : Dr. G. Umadevi
Project Cost : ₹ 100000 Lakhs
Duration : 22-JAN-98 to 21-MAY-98
Funding : Chennai Corporation
Traffic Study for Alwarpet Intersection - A feasibility study
Principle Investigator : Dr. G. Umadevi
Project Cost : ₹ 100000 Lakhs
Duration : 09-JAN-98 to 27-MAY-98
Funding : Chennai Corporation
Traffic Study for Turnbulls Road Intersection - A feasibility study
Principle Investigator : Dr. G. Umadevi
Project Cost : ₹ 100000 Lakhs
Duration : 05-JAN-98 to 29-MAY-98
Funding : Department of Town and Country Planning, Tamil Nadu
Traffic Study for Doveton Road Intersection - A feasibility study
Principle Investigator : Dr. G. Umadevi
Project Cost : ₹ 100000 Lakhs
Duration : 04-NOV-97 to 26-MAY-98
Funding : Department of Town and Country Planning
Traffic operational Management for Thirunelveli District
Principle Investigator : Dr. G. Umadevi
Project Cost : ₹ 1500000 Lakhs
Duration : 10-SEP-96 to 04-JAN-00
Funding : Department of Town and Country Planning
Removal and recovery of chromium (VI) from plating effluent using liquid membrane
Principle Investigator : Dr. K. Palanivelu
Duration : 01-APR-96 to 31-MAR-97
Comprehensive Traffic and Transportation Study for Madurai
Principle Investigator : Dr. G. Umadevi
Project Cost : ₹ 3500000 Lakhs
Duration : 25-JAN-96 to 02-APR-97
Funding : Department of Town and Country Planning
Population Distribution Model - A Study on Water Distribution Network for Madras Metro Area
Principle Investigator : Dr. G. Umadevi
Project Cost : ₹ 100000 Lakhs
Duration : 13-APR-94 to 29-AUG-94
Funding : Chennai Corporation
Development of a landuse transportation modeling principles of Systems Dynamics and EMME2 assignment techniques
Principle Investigator : Dr. G. Umadevi
Project Cost : ₹ 193000 Lakhs
Duration : 10-MAR-93 to 21-OCT-99
Funding : UGC- Major Research Project
Madras Sub-Urban Rail Systems - Study on fair Policy
Principle Investigator : Dr. G. Umadevi
Project Cost : ₹ 300000 Lakhs
Duration : 25-JAN-93 to 23-JUN-93
Funding : Ministry of Railways , Government of India
Urban Transportation Planning in 1990
Principle Investigator : Dr. G. Umadevi
Duration : 11-APR-90 to 10-OCT-91
Urban Transportation Planning in 1990
Principle Investigator : Dr. G. Umadevi
Project Cost : ₹ 100000 Lakhs
Duration : 09-APR-90 to 03-OCT-91
Funding : UGC