Consultancy
TNCM-Green Fellowship Programme
Coordinator : Dr. R. Saravanan
Project Cost : ₹ 1200 Lakhs
Duration : 31-JUL-23 to 01-AUG-25
Funding : DOE, Govt. of Tamil Nadu
Purification of hydrogen using modified PEMFC
Coordinator : Dr. D. Sangeetha
Project Cost : ₹ 6.32142 Lakhs
Duration : 01-MAY-23 to 28-DEC-23
Funding : M/s Synthetic Gas, Kadappa, AP
Surge Pressure calculation for DI pipes
Coordinator : Dr. D. Sangeetha
Project Cost : ₹ .15 Lakhs
Duration : 12-APR-23 to 20-APR-23
Funding : M/s Tolani Projects, Chennai, TN
Methodology for Separation of Hydrogen from Syngas using Modified PEM Fuel cell
Coordinator : Dr. D. Sangeetha
Project Cost : ₹ 3.83274 Lakhs
Duration : 01-AUG-22 to 31-AUG-22
Funding : The Synthetic Gases OPC Pvt Ltd
Finite Element Analysis of GIS Substation Structure (Shapar 220 kV)
Coordinator : Dr. K. Shanmugasundaram
Project Cost : ₹ 2.36 Lakhs
Duration : 01-JAN-22 to 31-DEC-23
Funding : M/s. KNR Engineers India Pvt Ltd
DESIGN AND DEVELOPMENT OF SCREW BASED ELEVATORS
Coordinator : Dr. K. Shanmugasundaram
Project Cost : ₹ 1.18 Lakhs
Duration : 01-JAN-22 to 31-DEC-23
Funding : M/s. M.L. AUTO ENTERPRISES
Finite Element Analysis of GTC Lab – B Vibration shed – Mezzanine floor
Coordinator : Dr. K. Shanmugasundaram
Project Cost : ₹ .177 Lakhs
Duration : 01-JAN-22 to 31-DEC-23
Funding : M/s ULOGA Engineers
Design for the development of 5 meter Electro-Mechanical Telescopic Mast
Coordinator : Dr. K. Shanmugasundaram
Project Cost : ₹ 2.655 Lakhs
Duration : 01-JAN-22 to 31-DEC-23
Funding : M/s. Sharada Mechanical Engineering
Designing and fabrication of >1 kW prototype vertical axis wind turbine
Coordinator : Dr. K. Shanmugasundaram
Project Cost : ₹ 1.652 Lakhs
Duration : 01-JAN-22 to 31-DEC-23
Funding : M/s. Enmas O & M Services Pvt Ltd
Finite Element Analysis of GIS Substation Structure (Tuticorn)
Coordinator : Dr. K. Shanmugasundaram
Project Cost : ₹ 1.77 Lakhs
Duration : 01-JAN-22 to 31-DEC-23
Funding : M/s. KNR Engineers India Pvt Ltd
Design and Development of Safety mechanism in a winch assembly
Coordinator : Dr. K. Shanmugasundaram
Project Cost : ₹ 4.72 Lakhs
Duration : 01-JAN-22 to 31-DEC-23
Funding : M/s. Siemens Gamesa Renewable Power Pvt Ltd
Technology Transfer Fellowship
Coordinator : Dr. K. Shanmugasundaram
Project Cost : ₹ .18 Lakhs
Duration : 01-JAN-22 to 31-DEC-23
Funding : CTDT
Design for main cable and the lifting system for the construction of arch bridge spanning 75 meter
Coordinator : Dr. K. Shanmugasundaram
Project Cost : ₹ 1.9175 Lakhs
Duration : 01-JAN-22 to 31-DEC-23
Funding : M/s. VME Precast Products
Stress, Fatigue and deflection analysis for the plate
Coordinator : Dr. K. Shanmugasundaram
Project Cost : ₹ .2301 Lakhs
Duration : 01-JAN-22 to 31-DEC-23
Funding : M/s SENSOTECH Redifining Transducer Technology
High acceleration loading analysis and stress analysis over the bolted joints of base plate in Vibration and shock environment
Coordinator : Dr. K. Shanmugasundaram
Project Cost : ₹ .32028 Lakhs
Duration : 01-JAN-22 to 31-DEC-23
Funding : M/s Space Kidz India
FEA Analysis of Platform Structure and Stand
Coordinator : Dr. M. Pradeep Kumar
Duration : 23-SEP-21 to 25-SEP-21
Vibration Measurement of ground at factory
Coordinator : Dr. M. Pradeep Kumar
Duration : 15-SEP-21 to 17-SEP-21
FEA Analysis of Antenna Positioner Unit
Coordinator : Dr. M. Pradeep Kumar
Duration : 15-SEP-21 to 22-SEP-21
Finite Element Analysis of Temporary Platform
Coordinator : Dr. M. Pradeep Kumar
Duration : 18-MAY-21 to 25-MAY-21
Finite Element Analysis of GIS insulated Substation structures(SHAPAR 220kv Revised)
Coordinator : Dr. M. Pradeep Kumar
Duration : 22-APR-21 to 06-MAY-21
FEA Analysis of platform Structure
Coordinator : Dr. M. Pradeep Kumar
Duration : 26-MAR-21 to 27-MAR-21
Stability review of the drive system for Aerial View Tower drive Modification
Coordinator : Dr. M. Pradeep Kumar
Duration : 24-MAR-21 to 24-APR-21
Friction stir welding
Coordinator : Dr. V.S. Senthil Kumar
Project Cost : ₹ .21 Lakhs
Duration : 01-JAN-21 to 01-JAN-22
Funding : Engineering college students
Computational fluid dynamic analysis inSewer Line 500mm diameter
Coordinator : Dr. M. Pradeep Kumar
Duration : 07-NOV-20 to 11-NOV-20
Computational fluid dynamic analysis in Sewer Line
Coordinator : Dr. M. Pradeep Kumar
Duration : 16-SEP-20 to 18-SEP-20
Design for the development of 5-meter Electro-Mechanical Telescopic Mast
Coordinator : Dr. M. Pradeep Kumar
Duration : 01-SEP-20 to 01-DEC-20
Finite Elemnt analysis of modfied 220kv GIS Substation structures for SHAPAR Substation
Coordinator : Dr. M. Pradeep Kumar
Duration : 28-JUL-20 to 08-AUG-20
3D Printing of V Plug, D36 cover, Baffle, ULX5 new cover, ULX5 new top plate
Coordinator : Dr. M. Pradeep Kumar
Duration : 26-JUN-20 to 02-JUL-20
Finite Element Analysis of GIS substation Structure(PHAGI 765KV)
Coordinator : Dr. M. Pradeep Kumar
Duration : 28-MAR-20 to 08-APR-20
Finite Element Analysis of GIS substation Structure(SHAPAR 400KV)
Coordinator : Dr. M. Pradeep Kumar
Duration : 17-MAR-20 to 27-MAR-20
Finite Element Analysis of GIS substation Structure(SHAPAR 220KV)
Coordinator : Dr. M. Pradeep Kumar
Duration : 17-MAR-20 to 27-MAR-20
CFD analysis of the flow pattern of milk in the nipple design created
Coordinator : Dr. M. Pradeep Kumar
Duration : 04-MAR-20 to 05-MAR-20
Friction stir welding
Coordinator : Dr. V.S. Senthil Kumar
Project Cost : ₹ .177 Lakhs
Duration : 01-JAN-20 to 01-JAN-21
Funding : Engineering college students
Design of 155m meteorological mast(rail mechanism with lifter/puller) with guyed wires
Coordinator : Dr. M. Pradeep Kumar
Duration : 10-DEC-19 to 10-JAN-20
Finite Element Analysis of GIS Substation Structure(BHUJ)
Coordinator : Dr. M. Pradeep Kumar
Duration : 26-NOV-19 to 10-DEC-19
Finite Element Analysis of GIS Substation Structure(TUTICORIN)
Coordinator : Dr. M. Pradeep Kumar
Duration : 26-NOV-19 to 10-DEC-19
Testing,design and analysis of worm and worm wheel assembly in a winch
Coordinator : Dr. M. Pradeep Kumar
Duration : 01-AUG-19 to 30-SEP-19
Design and development of safety mechanism in a winch assembly
Coordinator : Dr. M. Pradeep Kumar
Duration : 01-AUG-19 to 30-SEP-19
Design of Instrument enclosure for a PCB
Coordinator : Dr. M. Pradeep Kumar
Duration : 11-JUL-19 to 31-JUL-19
Design of 100M Lattice steel wind mast for wind speed of 55 m/s
Coordinator : Dr. M. Pradeep Kumar
Duration : 12-JUN-19 to 20-JUN-19
Electrical Power Generation from spring with Clock Escapement
Coordinator : Dr. M. Pradeep Kumar
Duration : 20-MAY-19 to 10-JUL-19
Designing and fabrication of >1KW prototype vertical axiz wind turbine
Coordinator : Dr. M. Pradeep Kumar
Duration : 11-APR-19 to 11-OCT-19
Design Revision of 165m wind mast
Coordinator : Dr. M. Pradeep Kumar
Duration : 25-JAN-19 to 10-FEB-19
Friction stir welding
Coordinator : Dr. V.S. Senthil Kumar
Project Cost : ₹ .82 Lakhs
Duration : 01-JAN-19 to 01-JAN-20
Funding : Engineering college students
Investigations on electromagnetic forming process of thermal spray coated AISI316L sheets used to make metallic bipolar proton exchange fuel cells and forming tubular and sheet metal components of aluminum alloys for automotive applications
Coordinator : Dr. K. Shanmugasundaram
Project Cost : ₹ 282 Lakhs
Duration : 01-JAN-19 to 31-JAN-24
Funding : Rashtriya Uchchatar Shiksha Abhiyan (RUSA 2.0)
Design vibration analysis and Experimental Testing of Antenna Fixture
Coordinator : Dr. K. Malarmohan
Duration : 05-DEC-18 to 26-FEB-19
Finite Element Analysis of 30m, 4 section Wind mast
Coordinator : Dr. K. Malarmohan
Duration : 31-AUG-18 to 27-MAR-19
MES Document Approval
Coordinator : Dr. R. Saravanan
Duration : 17-JUL-18 to 10-JAN-19
Design and Development of 161 m tall meteorological mast
Coordinator : Dr. K. Malarmohan
Project Cost : ₹ 306800 Lakhs
Duration : 11-JUL-18 to 07-MAY-19
Funding : M/s Siemens Gamesa Renewable Power Pvt Ltd
Development of Solar Thermal Dehydration system
Coordinator : Dr. R. Saravanan
Duration : 01-MAY-18 to 30-APR-19
Design of a 130m tall metrological mast with guyed wires
Coordinator : Dr. K. Malarmohan
Duration : 17-FEB-18 to 30-MAY-19
Torsional Vibration Analysis of the 12 cylinder V Engine with the attached Pump
Coordinator : Dr. K. Malarmohan
Duration : 05-FEB-18 to 15-MAY-18
Preparation of HVAC & R Glossary book
Coordinator : Dr. R. Saravanan
Duration : 10-JAN-18 to 28-FEB-18
Friction stir welding
Coordinator : Dr. V.S. Senthil Kumar
Project Cost : ₹ .708 Lakhs
Duration : 01-JAN-18 to 01-JAN-19
Funding : Engineering college students
Design and Development of Screw based Elevator
Coordinator : Dr. K. Shanmugasundaram
Duration : 01-AUG-17 to 31-OCT-18
Design and validation of a 130m lattice wind mast
Coordinator : Dr. K. Malarmohan
Project Cost : ₹ 165200 Lakhs
Duration : 11-JUL-17 to 11-JUL-18
Funding : M/s Sri Bhuvaneswari Enterprises
Testing of anchors
Coordinator : Dr. S. Balasivanandha Prabu
Project Cost : ₹ .5 Lakhs
Duration : 01-JUL-17 to 31-JUL-17
Funding : M/S.BIOTEK, Chetan Meditech Pvt.Ltd, Ahmedabad
Field testing of Solar Cold Storage Systems
Coordinator : Dr. R. Saravanan
Duration : 04-MAY-17 to 30-APR-18
Drilling Operation
Coordinator : Dr. M. Pradeep Kumar
Duration : 21-MAR-17 to 21-MAR-17
Friction stir welding
Coordinator : Dr. V.S. Senthil Kumar
Project Cost : ₹ .17 Lakhs
Duration : 01-JAN-17 to 01-JAN-18
Funding : Engineering college students
Development and Characterization of Aluminium Based Nano Composites For Structural Applicatins
Coordinator : Dr. K. Shanmugasundaram
Project Cost : ₹ 9.2335 Lakhs
Duration : 01-JAN-16 to 31-DEC-18
Funding : CVRDE-DRDO
Friction stir welding
Coordinator : Dr. V.S. Senthil Kumar
Project Cost : ₹ 1.79 Lakhs
Duration : 01-JAN-16 to 01-JAN-17
Funding : Engineering college students
Development of Fuel Activator for SPIHER-MSME Business Incubator
Coordinator : Dr. G. Nagarajan
Project Cost : ₹ .2809 Lakhs
Duration : 01-AUG-13 to 20-DEC-13
Funding : St. Peter's University
Development of 11 HP Diesel Engine for Upgradation
Coordinator : Dr. G. Nagarajan
Project Cost : ₹ .25281 Lakhs
Duration : 02-MAY-13 to 17-MAY-13
Funding : Vel Tech technical University
Technical Opinion for the Failure of Napier make 6 MW Turbocharger in Wartsila DG Set
Coordinator : Dr. G. Nagarajan
Project Cost : ₹ .2809 Lakhs
Duration : 05-MAY-12 to 15-MAY-12
Funding : Global Vision - Surveyors, Valuers, Loss Assessors
CFD Analysis of Particle Separation in a Dense Media Cyclone
Coordinator : Dr. A. Manivannan
Project Cost : ₹ 4.37 Lakhs
Duration : 17-FEB-09 to 29-SEP-10
Funding : TATA STEEL
Development of Biodiesel Fueled Engine for Use in Tractors
Coordinator : Dr. G. Nagarajan
Project Cost : ₹ .1687 Lakhs
Duration : 05-MAY-08 to 22-APR-11
Funding : Green Field Equipments (P) Ltd.
Detailed Survey and Preparation of Energy Plan for 3 Selected Village clusters
Coordinator : Dr. R. Muruganandhan
Duration : 21-JUN-06 to 16-OCT-07
Detailed Energy Audit
Coordinator : Dr. G. Nagarajan
Project Cost : ₹ .25 Lakhs
Duration : 12-JUL-04 to 15-OCT-04
Funding : Tantech Agro Hcemicals Limited
Detailed Energy Audit
Coordinator : Dr. G. Nagarajan
Project Cost : ₹ .25 Lakhs
Duration : 12-JUL-04 to 15-OCT-04
Funding : Tantech Agro Chemicals Limited
Fuel Assessment Study
Coordinator : Dr. G. Nagarajan
Project Cost : ₹ 1.9663 Lakhs
Duration : 12-JAN-04 to 21-SEP-07
Funding : ETA Power Gen Private Limited
Verification of SPV Home & Street Lighting
Coordinator : Dr. G. Nagarajan
Project Cost : ₹ 2.04611 Lakhs
Duration : 20-OCT-03 to 22-FEB-08
Funding : Tamilnadu Energy Development
Evaluation of Fuel Additives for Engine Application
Coordinator : Dr. G. Nagarajan
Project Cost : ₹ .5 Lakhs
Duration : 15-OCT-03 to 20-MAY-04
Funding : Petroleum Products Parallel Marketeers Association
Development of Dual Fuel System for I.C. Engine
Coordinator : Dr. G. Nagarajan
Project Cost : ₹ .1 Lakhs
Duration : 01-SEP-03 to 20-FEB-04
Funding : Central Leather research Institute
Development of Biodiesel Engine
Coordinator : Dr. G. Nagarajan
Project Cost : ₹ .1 Lakhs
Duration : 01-APR-03 to 22-JAN-04
Funding : Green Power Tech
Detailed Energy Audit
Coordinator : Dr. G. Nagarajan
Project Cost : ₹ .9 Lakhs
Duration : 07-OCT-02 to 27-FEB-04
Funding : The Hutti Gold Mines Company Limited