Consultancy

TNCM-Green Fellowship Programme

Coordinator : Dr. R. Saravanan

Project Cost : ₹ 1200 Lakhs

Duration : 31-JUL-23 to 01-AUG-25

Funding  : DOE, Govt. of Tamil Nadu

Purification of hydrogen using modified PEMFC

Coordinator : Dr. D. Sangeetha

Project Cost : ₹ 6.32142 Lakhs

Duration : 01-MAY-23 to 28-DEC-23

Funding  : M/s Synthetic Gas, Kadappa, AP

Surge Pressure calculation for DI pipes

Coordinator : Dr. D. Sangeetha

Project Cost : ₹ .15 Lakhs

Duration : 12-APR-23 to 20-APR-23

Funding  : M/s Tolani Projects, Chennai, TN

Methodology for Separation of Hydrogen from Syngas using Modified PEM Fuel cell

Coordinator : Dr. D. Sangeetha

Project Cost : ₹ 3.83274 Lakhs

Duration : 01-AUG-22 to 31-AUG-22

Funding  : The Synthetic Gases OPC Pvt Ltd

Finite Element Analysis of GIS Substation Structure (Shapar 220 kV)

Coordinator : Dr. K. Shanmugasundaram

Project Cost : ₹ 2.36 Lakhs

Duration : 01-JAN-22 to 31-DEC-23

Funding  : M/s. KNR Engineers India Pvt Ltd

DESIGN AND DEVELOPMENT OF SCREW BASED ELEVATORS

Coordinator : Dr. K. Shanmugasundaram

Project Cost : ₹ 1.18 Lakhs

Duration : 01-JAN-22 to 31-DEC-23

Funding  : M/s. M.L. AUTO ENTERPRISES

Finite Element Analysis of GTC Lab – B Vibration shed – Mezzanine floor

Coordinator : Dr. K. Shanmugasundaram

Project Cost : ₹ .177 Lakhs

Duration : 01-JAN-22 to 31-DEC-23

Funding  : M/s ULOGA Engineers

Design for the development of 5 meter Electro-Mechanical Telescopic Mast

Coordinator : Dr. K. Shanmugasundaram

Project Cost : ₹ 2.655 Lakhs

Duration : 01-JAN-22 to 31-DEC-23

Funding  : M/s. Sharada Mechanical Engineering

Designing and fabrication of >1 kW prototype vertical axis wind turbine

Coordinator : Dr. K. Shanmugasundaram

Project Cost : ₹ 1.652 Lakhs

Duration : 01-JAN-22 to 31-DEC-23

Funding  : M/s. Enmas O & M Services Pvt Ltd

Finite Element Analysis of GIS Substation Structure (Tuticorn)

Coordinator : Dr. K. Shanmugasundaram

Project Cost : ₹ 1.77 Lakhs

Duration : 01-JAN-22 to 31-DEC-23

Funding  : M/s. KNR Engineers India Pvt Ltd

Design and Development of Safety mechanism in a winch assembly

Coordinator : Dr. K. Shanmugasundaram

Project Cost : ₹ 4.72 Lakhs

Duration : 01-JAN-22 to 31-DEC-23

Funding  : M/s. Siemens Gamesa Renewable Power Pvt Ltd

Technology Transfer Fellowship

Coordinator : Dr. K. Shanmugasundaram

Project Cost : ₹ .18 Lakhs

Duration : 01-JAN-22 to 31-DEC-23

Funding  : CTDT

Design for main cable and the lifting system for the construction of arch bridge spanning 75 meter

Coordinator : Dr. K. Shanmugasundaram

Project Cost : ₹ 1.9175 Lakhs

Duration : 01-JAN-22 to 31-DEC-23

Funding  : M/s. VME Precast Products

Stress, Fatigue and deflection analysis for the plate

Coordinator : Dr. K. Shanmugasundaram

Project Cost : ₹ .2301 Lakhs

Duration : 01-JAN-22 to 31-DEC-23

Funding  : M/s SENSOTECH Redifining Transducer Technology

High acceleration loading analysis and stress analysis over the bolted joints of base plate in Vibration and shock environment

Coordinator : Dr. K. Shanmugasundaram

Project Cost : ₹ .32028 Lakhs

Duration : 01-JAN-22 to 31-DEC-23

Funding  : M/s Space Kidz India

FEA Analysis of Platform Structure and Stand

Coordinator : Dr. M. Pradeep Kumar

Duration : 23-SEP-21 to 25-SEP-21

Vibration Measurement of ground at factory

Coordinator : Dr. M. Pradeep Kumar

Duration : 15-SEP-21 to 17-SEP-21

FEA Analysis of Antenna Positioner Unit

Coordinator : Dr. M. Pradeep Kumar

Duration : 15-SEP-21 to 22-SEP-21

Finite Element Analysis of Temporary Platform

Coordinator : Dr. M. Pradeep Kumar

Duration : 18-MAY-21 to 25-MAY-21

Finite Element Analysis of GIS insulated Substation structures(SHAPAR 220kv Revised)

Coordinator : Dr. M. Pradeep Kumar

Duration : 22-APR-21 to 06-MAY-21

FEA Analysis of platform Structure

Coordinator : Dr. M. Pradeep Kumar

Duration : 26-MAR-21 to 27-MAR-21

Stability review of the drive system for Aerial View Tower drive Modification

Coordinator : Dr. M. Pradeep Kumar

Duration : 24-MAR-21 to 24-APR-21

Friction stir welding

Coordinator : Dr. V.S. Senthil Kumar

Project Cost : ₹ .21 Lakhs

Duration : 01-JAN-21 to 01-JAN-22

Funding  : Engineering college students

Computational fluid dynamic analysis inSewer Line 500mm diameter

Coordinator : Dr. M. Pradeep Kumar

Duration : 07-NOV-20 to 11-NOV-20

Computational fluid dynamic analysis in Sewer Line

Coordinator : Dr. M. Pradeep Kumar

Duration : 16-SEP-20 to 18-SEP-20

Design for the development of 5-meter Electro-Mechanical Telescopic Mast

Coordinator : Dr. M. Pradeep Kumar

Duration : 01-SEP-20 to 01-DEC-20

Finite Elemnt analysis of modfied 220kv GIS Substation structures for SHAPAR Substation

Coordinator : Dr. M. Pradeep Kumar

Duration : 28-JUL-20 to 08-AUG-20

3D Printing of V Plug, D36 cover, Baffle, ULX5 new cover, ULX5 new top plate

Coordinator : Dr. M. Pradeep Kumar

Duration : 26-JUN-20 to 02-JUL-20

Finite Element Analysis of GIS substation Structure(PHAGI 765KV)

Coordinator : Dr. M. Pradeep Kumar

Duration : 28-MAR-20 to 08-APR-20

Finite Element Analysis of GIS substation Structure(SHAPAR 400KV)

Coordinator : Dr. M. Pradeep Kumar

Duration : 17-MAR-20 to 27-MAR-20

Finite Element Analysis of GIS substation Structure(SHAPAR 220KV)

Coordinator : Dr. M. Pradeep Kumar

Duration : 17-MAR-20 to 27-MAR-20

CFD analysis of the flow pattern of milk in the nipple design created

Coordinator : Dr. M. Pradeep Kumar

Duration : 04-MAR-20 to 05-MAR-20

Friction stir welding

Coordinator : Dr. V.S. Senthil Kumar

Project Cost : ₹ .177 Lakhs

Duration : 01-JAN-20 to 01-JAN-21

Funding  : Engineering college students

Design of 155m meteorological mast(rail mechanism with lifter/puller) with guyed wires

Coordinator : Dr. M. Pradeep Kumar

Duration : 10-DEC-19 to 10-JAN-20

Finite Element Analysis of GIS Substation Structure(BHUJ)

Coordinator : Dr. M. Pradeep Kumar

Duration : 26-NOV-19 to 10-DEC-19

Finite Element Analysis of GIS Substation Structure(TUTICORIN)

Coordinator : Dr. M. Pradeep Kumar

Duration : 26-NOV-19 to 10-DEC-19

Testing,design and analysis of worm and worm wheel assembly in a winch

Coordinator : Dr. M. Pradeep Kumar

Duration : 01-AUG-19 to 30-SEP-19

Design and development of safety mechanism in a winch assembly

Coordinator : Dr. M. Pradeep Kumar

Duration : 01-AUG-19 to 30-SEP-19

Design of Instrument enclosure for a PCB

Coordinator : Dr. M. Pradeep Kumar

Duration : 11-JUL-19 to 31-JUL-19

Design of 100M Lattice steel wind mast for wind speed of 55 m/s

Coordinator : Dr. M. Pradeep Kumar

Duration : 12-JUN-19 to 20-JUN-19

Electrical Power Generation from spring with Clock Escapement

Coordinator : Dr. M. Pradeep Kumar

Duration : 20-MAY-19 to 10-JUL-19

Designing and fabrication of >1KW prototype vertical axiz wind turbine

Coordinator : Dr. M. Pradeep Kumar

Duration : 11-APR-19 to 11-OCT-19

Design Revision of 165m wind mast

Coordinator : Dr. M. Pradeep Kumar

Duration : 25-JAN-19 to 10-FEB-19

Friction stir welding

Coordinator : Dr. V.S. Senthil Kumar

Project Cost : ₹ .82 Lakhs

Duration : 01-JAN-19 to 01-JAN-20

Funding  : Engineering college students

Investigations on electromagnetic forming process of thermal spray coated AISI316L sheets used to make metallic bipolar proton exchange fuel cells and forming tubular and sheet metal components of aluminum alloys for automotive applications

Coordinator : Dr. K. Shanmugasundaram

Project Cost : ₹ 282 Lakhs

Duration : 01-JAN-19 to 31-JAN-24

Funding  : Rashtriya Uchchatar Shiksha Abhiyan (RUSA 2.0)

Design vibration analysis and Experimental Testing of Antenna Fixture

Coordinator : Dr. K. Malarmohan

Duration : 05-DEC-18 to 26-FEB-19

Finite Element Analysis of 30m, 4 section Wind mast

Coordinator : Dr. K. Malarmohan

Duration : 31-AUG-18 to 27-MAR-19

MES Document Approval

Coordinator : Dr. R. Saravanan

Duration : 17-JUL-18 to 10-JAN-19

Design and Development of 161 m tall meteorological mast

Coordinator : Dr. K. Malarmohan

Project Cost : ₹ 306800 Lakhs

Duration : 11-JUL-18 to 07-MAY-19

Funding  : M/s Siemens Gamesa Renewable Power Pvt Ltd

Development of Solar Thermal Dehydration system

Coordinator : Dr. R. Saravanan

Duration : 01-MAY-18 to 30-APR-19

Design of a 130m tall metrological mast with guyed wires

Coordinator : Dr. K. Malarmohan

Duration : 17-FEB-18 to 30-MAY-19

Torsional Vibration Analysis of the 12 cylinder V Engine with the attached Pump

Coordinator : Dr. K. Malarmohan

Duration : 05-FEB-18 to 15-MAY-18

Preparation of HVAC & R Glossary book

Coordinator : Dr. R. Saravanan

Duration : 10-JAN-18 to 28-FEB-18

Friction stir welding

Coordinator : Dr. V.S. Senthil Kumar

Project Cost : ₹ .708 Lakhs

Duration : 01-JAN-18 to 01-JAN-19

Funding  : Engineering college students

Design and Development of Screw based Elevator

Coordinator : Dr. K. Shanmugasundaram

Duration : 01-AUG-17 to 31-OCT-18

Design and validation of a 130m lattice wind mast

Coordinator : Dr. K. Malarmohan

Project Cost : ₹ 165200 Lakhs

Duration : 11-JUL-17 to 11-JUL-18

Funding  : M/s Sri Bhuvaneswari Enterprises

Testing of anchors

Coordinator : Dr. S. Balasivanandha Prabu

Project Cost : ₹ .5 Lakhs

Duration : 01-JUL-17 to 31-JUL-17

Funding  : M/S.BIOTEK, Chetan Meditech Pvt.Ltd, Ahmedabad

Field testing of Solar Cold Storage Systems

Coordinator : Dr. R. Saravanan

Duration : 04-MAY-17 to 30-APR-18

Drilling Operation

Coordinator : Dr. M. Pradeep Kumar

Duration : 21-MAR-17 to 21-MAR-17

Friction stir welding

Coordinator : Dr. V.S. Senthil Kumar

Project Cost : ₹ .17 Lakhs

Duration : 01-JAN-17 to 01-JAN-18

Funding  : Engineering college students

Development and Characterization of Aluminium Based Nano Composites For Structural Applicatins

Coordinator : Dr. K. Shanmugasundaram

Project Cost : ₹ 9.2335 Lakhs

Duration : 01-JAN-16 to 31-DEC-18

Funding  : CVRDE-DRDO

Friction stir welding

Coordinator : Dr. V.S. Senthil Kumar

Project Cost : ₹ 1.79 Lakhs

Duration : 01-JAN-16 to 01-JAN-17

Funding  : Engineering college students

Development of Fuel Activator for SPIHER-MSME Business Incubator

Coordinator : Dr. G. Nagarajan

Project Cost : ₹ .2809 Lakhs

Duration : 01-AUG-13 to 20-DEC-13

Funding  : St. Peter's University

Development of 11 HP Diesel Engine for Upgradation

Coordinator : Dr. G. Nagarajan

Project Cost : ₹ .25281 Lakhs

Duration : 02-MAY-13 to 17-MAY-13

Funding  : Vel Tech technical University

Technical Opinion for the Failure of Napier make 6 MW Turbocharger in Wartsila DG Set

Coordinator : Dr. G. Nagarajan

Project Cost : ₹ .2809 Lakhs

Duration : 05-MAY-12 to 15-MAY-12

Funding  : Global Vision - Surveyors, Valuers, Loss Assessors

CFD Analysis of Particle Separation in a Dense Media Cyclone

Coordinator : Dr. A. Manivannan

Project Cost : ₹ 4.37 Lakhs

Duration : 17-FEB-09 to 29-SEP-10

Funding  : TATA STEEL

Development of Biodiesel Fueled Engine for Use in Tractors

Coordinator : Dr. G. Nagarajan

Project Cost : ₹ .1687 Lakhs

Duration : 05-MAY-08 to 22-APR-11

Funding  : Green Field Equipments (P) Ltd.

Detailed Survey and Preparation of Energy Plan for 3 Selected Village clusters

Coordinator : Dr. R. Muruganandhan

Duration : 21-JUN-06 to 16-OCT-07

Detailed Energy Audit

Coordinator : Dr. G. Nagarajan

Project Cost : ₹ .25 Lakhs

Duration : 12-JUL-04 to 15-OCT-04

Funding  : Tantech Agro Hcemicals Limited

Detailed Energy Audit

Coordinator : Dr. G. Nagarajan

Project Cost : ₹ .25 Lakhs

Duration : 12-JUL-04 to 15-OCT-04

Funding  : Tantech Agro Chemicals Limited

Fuel Assessment Study

Coordinator : Dr. G. Nagarajan

Project Cost : ₹ 1.9663 Lakhs

Duration : 12-JAN-04 to 21-SEP-07

Funding  : ETA Power Gen Private Limited

Verification of SPV Home & Street Lighting

Coordinator : Dr. G. Nagarajan

Project Cost : ₹ 2.04611 Lakhs

Duration : 20-OCT-03 to 22-FEB-08

Funding  : Tamilnadu Energy Development

Evaluation of Fuel Additives for Engine Application

Coordinator : Dr. G. Nagarajan

Project Cost : ₹ .5 Lakhs

Duration : 15-OCT-03 to 20-MAY-04

Funding  : Petroleum Products Parallel Marketeers Association

Development of Dual Fuel System for I.C. Engine

Coordinator : Dr. G. Nagarajan

Project Cost : ₹ .1 Lakhs

Duration : 01-SEP-03 to 20-FEB-04

Funding  : Central Leather research Institute

Development of Biodiesel Engine

Coordinator : Dr. G. Nagarajan

Project Cost : ₹ .1 Lakhs

Duration : 01-APR-03 to 22-JAN-04

Funding  : Green Power Tech

Detailed Energy Audit

Coordinator : Dr. G. Nagarajan

Project Cost : ₹ .9 Lakhs

Duration : 07-OCT-02 to 27-FEB-04

Funding  : The Hutti Gold Mines Company Limited