Projects
ADDITIVE MANUFACTURING OF LATTICE STRUCTURED BIO-POLYMERIC IMPLANTS WITH METALLIC COATING FOR ORTHOPAEDICS
Principle Investigator : Dr. M. Pradeep Kumar
Project Cost : ₹ 23.52 Lakhs
Duration : 24-SEP-24 to 23-SEP-27
Funding : CMRG
Determination of the process window for the magneto rheological machining of the aluminum green composite under different cutting conditions
Principle Investigator : Dr. V.S. Senthil Kumar
Project Cost : ₹ 34.23 Lakhs
Duration : 12-JUL-24 to 12-JUL-27
Funding : Chief Minister's Research Grant, Government of Tamilnadu
Hydrogen separation from industrial gas effluent
Principle Investigator : Dr. D. Sangeetha
Project Cost : ₹ 38.27 Lakhs
Duration : 12-JUL-24 to 12-JUL-27
Funding : Chief Minister Research Grant
Additive Manufacturing of Self-Dissolvable/ Decayable Surgical Plates and Screws Using Eggshell Powder for Bone Fracture Treatment: An Innovative Solution to Eliminate Secondary Surgery
Principle Investigator : N. Muthu Mekala
Project Cost : ₹ .25 Lakhs
Duration : 20-SEP-23 to 29-FEB-24
Funding : CSRC ANNA UNIVERSITY
Recreation of new lithium-ion batteries from old lithium-ion batteries and testing the working efficiency of the recreated lithium-ion battery
Principle Investigator : Dr. D. Sangeetha
Project Cost : ₹ .15 Lakhs
Duration : 01-JUL-23 to 28-DEC-23
Funding : CSRC (CTDT), Anna University
Optimization of operational parameters for PEM electrolyzer model such as operating voltage, efficiency and rate of hydrogen production
Principle Investigator : Dr. D. Sangeetha
Project Cost : ₹ .08 Lakhs
Duration : 01-JUN-23 to 28-DEC-23
Funding : Dept of Mechanical Engg, CEG, Anna University
Design of concentrated solar receiver tube using inverse thermos-elastic analysis for improved efficiency and safe operation of solar power plants
Principle Investigator : Dr. S. Somasundharam
Project Cost : ₹ 2605900 Lakhs
Duration : 02-MAR-23 to 01-MAR-26
Funding : SERB
Investigation of sulphonated poly(1,4-phenylene ether ether sulfone) incorporated with cobalt oxide (Co3O4) decorated with phosphomolybdic acid composite membrane in MFC for increased power generation
Principle Investigator : Dr. D. Sangeetha
Project Cost : ₹ .25 Lakhs
Duration : 18-JUL-22 to 31-DEC-22
Funding : CTDT, Anna University
Novel polymer electrolyte membrane incorporated with sulfonated graphene oxide to exhibit enhanced antifouling properties in microbial fuel cell
Principle Investigator : Dr. D. Sangeetha
Project Cost : ₹ .25 Lakhs
Duration : 18-JUL-22 to 31-DEC-22
Funding : CTDT, Anna University
Production of hydrogen from domestic waste water by integrating sediment microbial fuel cells with electrolysis
Principle Investigator : Dr. D. Sangeetha
Project Cost : ₹ .2 Lakhs
Duration : 01-JUL-22 to 31-DEC-22
Funding : Dept of Mechanical Engg, CEG, Anna University
Nano enhanced PCM integrated microbial fuel cell for optimum performance
Principle Investigator : Dr. D. Sangeetha
Project Cost : ₹ .083 Lakhs
Duration : 01-JUL-22 to 31-DEC-22
Funding : Dept of Mechanical Engg, CEG, Anna University
Preparation and characterization of amine based polymer sorbents for CO2 sequestration
Principle Investigator : Dr. D. Sangeetha
Project Cost : ₹ .075 Lakhs
Duration : 01-JUN-22 to 31-DEC-22
Funding : Dept of Mechanical Engg, CEG, Anna University
Performance analysis of MnO2-CuO nanoparticles coated 3D printed cathode for Microbial Fuel Cell
Principle Investigator : Dr. D. Sangeetha
Project Cost : ₹ .07 Lakhs
Duration : 01-JUN-22 to 31-DEC-22
Funding : Dept of Mechanical Engg, CEG, Anna University
Effect of nanosilica fillers on the vibroacoustic characteristics of polymer nanocomposites and coated air panel
Principle Investigator : Dr. D. Sangeetha
Project Cost : ₹ .05 Lakhs
Duration : 01-JUN-22 to 31-DEC-22
Funding : Dept of Mechanical Engg, CEG, Anna University
Assessment of Different Hybrid Vehicle Technologies with High-Efficiency RCCI Engine Enabled with Effective Thermal Management System
Principle Investigator : Dr. D. Ganesh
Project Cost : ₹ 390 Lakhs
Duration : 18-NOV-21 to 31-DEC-24
Funding : RUSA 2.0
Development of TiCN based cermets modified by Si3N4, B4C and Cr3C2 for metal cutting application
Principle Investigator : Dr. S. Balasivanandha Prabu
Project Cost : ₹ 43.6436 Lakhs
Duration : 01-DEC-20 to 01-DEC-23
Funding : SERB
Fabrication and Characterization of inconel 718 wave springs by SLM technique for automotive applications
Principle Investigator : Dr. D. Sangeetha
Project Cost : ₹ .75 Lakhs
Duration : 01-JAN-20 to 30-JUN-20
Funding : TNSCST
Design and Fabrication of 3D printed scaffold for tumour treatment
Principle Investigator : Dr. M. Pradeep Kumar
Duration : 19-JUL-19 to 19-DEC-20
RUSA 2.0 project – ‘Electric Vehicle Technologies- Smart Material Characterization, Manufacturing and grid management’ under the thematic title ‘Material Selection, Fabrication, Characterization and Components Manufacturing for Automotive applications
Principle Investigator : Dr. S. Balasivanandha Prabu
Project Cost : ₹ 225 Lakhs
Duration : 01-JUL-19 to 01-JUL-23
Funding : MHRD-RUSA
Waste to Engine – Low Temperature Combustion of Sustainable Green Fuels
Principle Investigator : Dr. D. Ganesh
Project Cost : ₹ 21.78 Lakhs
Duration : 19-JUN-19 to 18-DEC-21
Funding : DST UKIERI
Characterization and biofouling studies on silver incorporated sulphonated poly ether ether ketone (SPEEK) membranes for microbial fuel cell applications
Principle Investigator : Dr. D. Sangeetha
Project Cost : ₹ 56.69 Lakhs
Duration : 01-JUN-19 to 31-MAY-23
Funding : MHRD-STARS
Design and Development of biocompatible electrospun polymeric nanofibrous scaffold delivery system for chronic skin wound regeneration
Principle Investigator : Dr. D. Sangeetha
Project Cost : ₹ 13 Lakhs
Duration : 01-JUN-19 to 31-MAY-22
Funding : ICMR
Docetaxel incorporated ZnO on polycaprolactone nanoscaffold biosensor for lung cancer diagnosis and treatment
Principle Investigator : Dr. D. Sangeetha
Project Cost : ₹ .25 Lakhs
Duration : 31-MAY-19 to 31-DEC-19
Funding : CTDT, Anna University
High temperature performance of AlCrN coated Ti6Al4V micro metal lattices synthesized by Selective Laser Sintering
Principle Investigator : Dr. D. Sangeetha
Project Cost : ₹ .25 Lakhs
Duration : 01-AUG-18 to 31-JAN-19
Funding : CTDT, Anna University
Fabrication and Analysis of SPEEK nanofiber with W-TNT as instructive scaffolds for cancer therapy
Principle Investigator : Dr. D. Sangeetha
Project Cost : ₹ .06 Lakhs
Duration : 15-JAN-18 to 15-JUN-18
Funding : Dept of Mechanical Engg, CEG, Anna University
Design and Fabrication of aminated zirconia nanoparticle incorporated PBAT nano fibrous material: its implication on cancer studies
Principle Investigator : Dr. D. Sangeetha
Project Cost : ₹ .06 Lakhs
Duration : 15-JAN-18 to 15-JUN-18
Funding : Dept of Mechanical Engg, CEG, Anna University
Student Project Grant – Development of suction muffler for R22 reciprocating compressor replacement by R410A and R32 refrigerants
Principle Investigator : Dr. P. Balachander
Project Cost : ₹ .95 Lakhs
Duration : 06-OCT-17 to 03-APR-18
Funding : M/s. ISHRAE HQ, Delhi
Improving machinability of difficult to machine materials through cutting edge preparation and minimum quantity lubrication
Principle Investigator : Dr. D. Samuel Raj
Project Cost : ₹ 18.74 Lakhs
Duration : 01-SEP-17 to 29-JAN-21
Funding : DST-SERB
Development of hybrid proton exchange membrane for improved fuel cell applications
Principle Investigator : Dr. D. Sangeetha
Project Cost : ₹ .2 Lakhs
Duration : 10-JUL-17 to 15-JAN-18
Funding : CTDT, Anna University
Synthesis of Phosphonated polymer electrolyte membranes for high temperature fuel cells
Principle Investigator : Dr. D. Sangeetha
Project Cost : ₹ 27.06 Lakhs
Duration : 17-JUN-17 to 16-JUN-20
Funding : SERB-DST
Exploring the role of positive surface charges of functionalized nano hydroxy apatite on the bio activity and anti microbial property
Principle Investigator : Dr. D. Sangeetha
Project Cost : ₹ .2 Lakhs
Duration : 10-JUN-17 to 15-JAN-18
Funding : CTDT, Anna University
Studies on vapour absorption heat transformer based in duplex components for water purification
Principle Investigator : Dr. R. Saravanan
Duration : 01-JUN-17 to 30-JUN-20
DEVELOPMENT OF BACTIBIOGRAMOSCOPE DEVICE
Principle Investigator : Dr. S. Rashia Begum
Duration : 28-MAR-17 to 28-MAR-20
Development and characterization of aluminum based nano composites for structural aplications
Principle Investigator : Dr. K. Shanmugasundaram
Duration : 01-FEB-17 to 31-JUL-18
Effective Utilisation of Methanol and Dimethyl Ether in an Automotive Engine Using Advanced Combustion Mode
Principle Investigator : Dr. D. Ganesh
Project Cost : ₹ 43.88 Lakhs
Duration : 27-JUL-16 to 03-NOV-19
Funding : DST CERI TMD
AN INVESTIGATION ON A SCALABLE AND SUSTAINBALE MICROBIAL FUEL CELL FOR CONTINUOUS ELECTRICITY PRODUCTION FROM WASTE BIOMASS
Principle Investigator : Dr. D. Sangeetha
Project Cost : ₹ 67 Lakhs
Duration : 06-JUL-16 to 05-JUL-19
Funding : DBT
Inorganic proton exchange membranes for fuel cell applications
Principle Investigator : Dr. D. Sangeetha
Project Cost : ₹ .25 Lakhs
Duration : 16-MAR-16 to 15-SEP-16
Funding : CTDT, Anna University
Experimental and Numerical studies on Twist Extrusion Process of Aluminium Alloys in Aerospace Industries
Principle Investigator : Dr. V.S. Senthil Kumar
Project Cost : ₹ 24.1 Lakhs
Duration : 03-MAR-16 to 02-MAY-16
Funding : DRDO/ER & IPR
Experimental investigations on the effect of cryogenic colling in Drilling difficult to machine materials
Principle Investigator : Dr. M. Pradeep Kumar
Duration : 07-SEP-15 to 06-SEP-16
Simultaneous power and cooling production using solar operated absorption refrigeration system for cold storage applications
Principle Investigator : Dr. R. Saravanan
Duration : 14-JUL-15 to 13-JUL-17
Development of bone graft on electrospun sulphonated poly ether ether ketone / nano hydroxyapatite (SPEEK/nHA) composites
Principle Investigator : Dr. D. Sangeetha
Project Cost : ₹ 17.13 Lakhs
Duration : 01-JUL-15 to 30-JUN-18
Funding : ICMR
Design and Fabrication of Powder based Inkjet 3D Printing
Principle Investigator : Dr. M. Pradeep Kumar
Duration : 16-MAR-15 to 16-SEP-15
Efficient electrodes and electrolytes for enhanced performance of proton exchange membrane fuel cell
Principle Investigator : Dr. D. Sangeetha
Project Cost : ₹ .25 Lakhs
Duration : 17-FEB-14 to 16-AUG-14
Funding : CTDT, Anna University
Fabrication of PVP/Chitosan Blend Fibers as Surgical Sutures with Enhanced Antimicrobial Activity
Principle Investigator : Dr. D. Sangeetha
Project Cost : ₹ .25 Lakhs
Duration : 01-JUN-13 to 31-DEC-13
Funding : CTDT, Anna University
Development of Low carbon technologies for combined storage and drying of Agro Products
Principle Investigator : Dr. R. Saravanan
Duration : 01-APR-13 to 31-MAR-16
Studies on thermal stability of Bulk nanostructured Aluminium-Lithium (AA8090) alloy processed by Repetitive Corrugation and Straightening
Principle Investigator : Dr. S. Balasivanandha Prabu
Duration : 01-APR-13 to 01-APR-14
Design and Development of Metal Matrix Composites (Al-SiCp) using Friction Stir Processing
Principle Investigator : Dr. V.S. Senthil Kumar
Project Cost : ₹ 39 Lakhs
Duration : 03-JAN-13 to 09-MAY-16
Funding : DST/SERB
Effect of Nano-Pt/CNT catalysts on the performance of Proton Exchange Membrane Fuel Cell (PEMFC)
Principle Investigator : Dr. D. Sangeetha
Project Cost : ₹ .25 Lakhs
Duration : 01-APR-12 to 01-AUG-12
Funding : CTDT, Anna University
Electrospun Carbon Nanofibers in Electrode Preparation for Fuel Cells
Principle Investigator : Dr. D. Sangeetha
Project Cost : ₹ 28.65 Lakhs
Duration : 01-MAY-11 to 30-APR-15
Funding : CSIR
Nanofiber Network Ion Conducting Polymer Composite for Fuel Cells
Principle Investigator : Dr. D. Sangeetha
Project Cost : ₹ 8.72 Lakhs
Duration : 01-FEB-11 to 24-SEP-13
Funding : UGC
Fabrication and Characterization of Porous PMMA/PSU/ceramic Composites for Orthopedic Application
Principle Investigator : Dr. D. Sangeetha
Project Cost : ₹ .25 Lakhs
Duration : 13-JAN-11 to 13-JUN-11
Funding : CTDT, Anna University
Microbial Fuel Cell Development for Production of Electricity from Waste Biomass
Principle Investigator : Dr. D. Sangeetha
Project Cost : ₹ 45.98 Lakhs
Duration : 01-OCT-10 to 30-SEP-14
Funding : DST
Study of evaporation heat transfer characteristics of pure and mixed refrigerants in small diameter tubes
Principle Investigator : Dr. P. Balachander
Project Cost : ₹ .5 Lakhs
Duration : 07-JUN-10 to 01-MAR-11
Funding : CTDT Anna University
Study of Polymer Nanohydroxyapatite composite scaffolds for Drug delivery and Tissue Engineering applications
Principle Investigator : Dr. D. Sangeetha
Project Cost : ₹ 15.62 Lakhs
Duration : 01-JUN-10 to 31-MAY-13
Funding : CSIR
Multilayer structured SiO2/SPSU Composite Membranes for Fuel Cell Applications
Principle Investigator : Dr. D. Sangeetha
Project Cost : ₹ .01 Lakhs
Duration : 01-JUN-10 to 30-NOV-10
Funding : MRSI
Study of Tribology of Sulfur containing Aromatic Polymer/nanohydroxyapatite Composites for Orthopedic Applications
Principle Investigator : Dr. D. Sangeetha
Project Cost : ₹ 11.2 Lakhs
Duration : 01-JUN-10 to 31-MAY-13
Funding : ICMR
Biological Fuel Cells and their Applications
Principle Investigator : Dr. D. Sangeetha
Project Cost : ₹ 3.6 Lakhs
Duration : 01-JUN-10 to 31-MAY-13
Funding : UGC
Blends and Composites of PSEBS for PEM and DMFC
Principle Investigator : Dr. D. Sangeetha
Project Cost : ₹ 3.6 Lakhs
Duration : 01-JUN-10 to 31-MAY-13
Funding : UGC
Development of Nanocatalysts for Fuel Cell Applications
Principle Investigator : Dr. D. Sangeetha
Project Cost : ₹ 4.72 Lakhs
Duration : 01-JUN-10 to 31-MAY-13
Funding : CSIR
Evaluation of various carbon supports for enhancing fuel cell performance
Principle Investigator : Dr. D. Sangeetha
Project Cost : ₹ 4.72 Lakhs
Duration : 01-JUN-10 to 31-MAY-13
Funding : CSIR
Development of PEMFC (Terminal Aid)
Principle Investigator : Dr. D. Sangeetha
Project Cost : ₹ 9.14 Lakhs
Duration : 15-APR-10 to 14-APR-11
Funding : BRNS
Ion exchange membranes for desalination process
Principle Investigator : Dr. D. Sangeetha
Project Cost : ₹ 21.62 Lakhs
Duration : 01-APR-10 to 30-SEP-13
Funding : BRNS
Experimental and Numerical studies of Friction Stir Welding of AZ31B Alloy
Principle Investigator : Dr. V.S. Senthil Kumar
Project Cost : ₹ 24 Lakhs
Duration : 26-NOV-09 to 31-MAR-13
Funding : DRDO/NRB
Performance Evaluation of Polymer Membranes in Heavy Metal Separation
Principle Investigator : Dr. D. Sangeetha
Project Cost : ₹ .25 Lakhs
Duration : 01-JUN-09 to 31-DEC-09
Funding : CTDT, Anna University
Synthesis and characterization of electrolyte membranes for fuel cells
Principle Investigator : Dr. D. Sangeetha
Project Cost : ₹ 3.76 Lakhs
Duration : 01-JUN-09 to 31-MAY-10
Funding : CSIR
Fabrication and Characterization of Sulphonated Polymer/nano hydroxyapatite Composites for Drug Delivery and Tissue Engineering Applications
Principle Investigator : Dr. D. Sangeetha
Project Cost : ₹ 7.83 Lakhs
Duration : 01-JUN-09 to 31-MAY-12
Funding : AICTE
Effect of various catalysts in enhancing the ionic activity of membranes for hydrogen sensor
Principle Investigator : Dr. D. Sangeetha
Project Cost : ₹ .25 Lakhs
Duration : 01-JUN-09 to 31-DEC-09
Funding : CTDT, Anna University
Design and Development of Biogas refrigerator for urban, semi urban and rural areas
Principle Investigator : Dr. R. Saravanan
Duration : 11-AUG-08 to 30-MAR-10
Synthesis of a new alkaline hydroxyl conducting crosslinked polymer interface for alkaline fuel cells
Principle Investigator : Dr. D. Sangeetha
Project Cost : ₹ 20.34 Lakhs
Duration : 01-JUN-08 to 31-MAY-11
Funding : DST
Investigations on friction stir processing of cast Aluminum alloys used in automobile industries
Principle Investigator : Dr. V.S. Senthil Kumar
Project Cost : ₹ 9.91 Lakhs
Duration : 01-APR-08 to 17-AUG-11
Funding : UGC (Major Research Scheme)
Air-cooled GAX based vapour absorption cooling systems
Principle Investigator : Dr. R. Saravanan
Duration : 20-JUL-07 to 19-JUL-10
Development of polymer blends as Electrolyte Membranes
Principle Investigator : Dr. D. Sangeetha
Project Cost : ₹ 13.47 Lakhs
Duration : 01-JUN-07 to 31-MAY-10
Funding : BRNS
Synthesis and Characterization of Polymer electrolyte membranes for fuel cell applications
Principle Investigator : Dr. D. Sangeetha
Project Cost : ₹ 7.32 Lakhs
Duration : 01-APR-05 to 31-MAR-08
Funding : DST
DEVELOPMET OF VAPOUR ABSORPTION HEAT TRANSFORMER FOR WATER PURIFICATION
Principle Investigator : Dr. R. Saravanan
Duration : 30-MAR-05 to 28-MAR-08
Development of Single Pressure Refrigeration System using Bio-gas as Energy Input
Principle Investigator : Dr. R. Saravanan
Duration : 18-AUG-03 to 16-AUG-05
Design and Development of Half-Effect Vapour Absorption Cold Storage systems using environmentally working fluids for low potential heat sources
Principle Investigator : Dr. R. Saravanan
Duration : 01-JUL-02 to 30-JUN-05
Studies on methanol based absorption cooling systems
Principle Investigator : Dr. R. Saravanan
Duration : 01-APR-02 to 31-MAR-03
Simultaneous Reduction of NOx and Particulate in Diesel Engine Using Multiple Injection
Principle Investigator : Dr. G. Nagarajan
Project Cost : ₹ 4 Lakhs
Duration : 01-APR-02 to 31-MAR-04
Funding : All India Council for Techinal Education
BIOMASS BASED COLD STORAGE SYSTEMS FOR RURAL AREA APPLICATIONS
Principle Investigator : Dr. R. Saravanan
Duration : 27-JUL-01 to 25-JUL-03
Environment friendly food processing technologies and sustainability
Principle Investigator : Dr. D. Mohanlal
Duration : 01-MAY-98 to 03-MAY-99